Increase of the capacity of the basic routes of export cargo traffic in Silesia, in stage IV

Increase of the capacity of the basic routes of export cargo traffic in Silesia, in stage IV

Increase of the capacity of the basic routes of export cargo traffic in Silesia, in stage IV 1387 1041 ArcelorMittal

Reconstruction of track No. 1 line No. 149-section Knurów Leszczyny in km 17,500-22,667 under the project entitled:. “Increased capacity of the basic routes of export cargo traffic in Silesia, in stage IV.”

Material:

  • 60E1 R260 ilość 87 szt. X 120m / 628,592 ton
  • 49E1 R260 ilość 1 szt. X 120m / 5,927 ton
Product Type

Transport

Location

Silesia - Poland

Weight

634,519 ton